
Completion of the well is a time-sensitive job, and having the necessary and correct information from drilling
is essential to successful completion and effective decision-making. WellEz.NET facilitates timely, organized data, reducing
cycle time between Drilling and Completion jobs, and increasing the net present value of the asset. Having the correct
component dimensions and tolerances is critical to a successful job. Using the WellEz.NET field operations reporting
system, data on every well component during drilling will be available throughout the completion phase.
Leverage the information in the WellEz.NET database to...
- Generate the completion plan and communicate to the field
- Document as-built conditions and equipment about the well for operations
- Note field cost and compare to AFE and invoice amounts
- Track time-based activities for performance metrics of contractors
- Record the quantity, type and cost of completion fluids
- Capture and view detailed flow-back productivity for any desired unit of time
- Assess performance of the completion before it is connected to sales lines
- Create a chronological report of completion activities
As information is submitted and available at any time via WellEz.NET, scheduling activities can be done daily, based on
accurate, documented completion performance. The WellEz.NET security hierarchy allows suppliers and contractors to view only their
respective information from any location using a standard web browser.
Use WellEz.NET to capture information on the installed equipment, unique features and field cost of each well as completed, including...
- Perforations
- Production string
- Tubing
- Packers
- Pumps
- Jewelry
- Gas lift valves
- Casing string
- Frac ports
WellEz.NET maintains a complete inventory of each well and the depth of each completion component. In addition to tracking
field cost during installation, this information is invaluable during workover, saving time and money for the workover process.
Contact WellEz to find out how an effective reporting solution can be used to better manage completion operations.